BUILT BETTER. DELIVERED QUICKER.
100% Transparent Pricing + Built in 6 Weeks or Less!
Luxury In-Ground Pools
Built in Weeks So You Can Swim Sooner.
In-house permitting. No delays, no downtime, just expertly built luxury pools delivered faster and more efficiently.
Transparent, 100% Upfront Pool Pricing.
No more guessing, no more vague bids and contracts with hidden fees. We provide you with clear and upfront pricing before you ever sign-up.
Start Your Pool Project Today and Enjoy by this Spring & Summer!
Plunge | 8' x 15'
$58,000
Construction Timeline: 5-6 Weeks
See What's Included
• Planning & Engineering
• Excavation, Steel, & Plumbing
• 4500 psi Shotcrete (Concrete)
• Porcelain Tile Coping & Waterline
• Mini Pebble Interior Finish
• Energy Efficient Equipment
• Automation, Autofill, and (2) LED Color Lights
Optional Upgrades
• Gas Pool Heater - $6,000
• Electric Pool Chiller & Heater - $9,500
• 6 Therapeutic Jets - $4,500
• Child Safety Fence - $7,000
• Saltwater Upgrade - FREE
• Umbrella Sleeve - $50
• Spa Integration - $25,000 (* Price includes Gas Heater and Jets)
Additional Information
• HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.
•Soils report - $4,500 (If city requires it).
• 6 week construction window starts once permits are received.
• Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.
• Pool equipment and automation by Hayward.
• Saltwater system comes standard but may be excluded if desired.
• Mini pebble finish by Stonescapes.
• Porcelain tile is outdoor and anti-slip rated.
• Stairs and benches are customizable.

Cocktail | 10' x 20'
$65,000
Construction Timeline: 5-6 Weeks
See What's Included
• Planning & Engineering
• Excavation, Steel, & Plumbing
• 4500 psi Shotcrete (Concrete)
• Porcelain Tile Coping & Waterline
• Mini Pebble Interior Finish
• Energy Efficient Equipment
• Automation, Autofill, and (2) LED Color Lights
Optional Upgrades
• Gas Pool Heater - $6,000
• Electric Pool Chiller & Heater - $9,500
• 6 Therapeutic Jets - $4,500
• Child Safety Fence - $7,000
• Saltwater Upgrade - FREE
• Umbrella Sleeve - $50
• Spa Integration - $25,000 (* Price includes Gas Heater and Jets)
Additional Information
• HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.
•Soils report - $4,500 (If city requires it).
• 6 week construction window starts once permits are received.
• Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.
• Pool equipment and automation by Hayward.
• Saltwater system comes standard but may be excluded if desired.
• Mini pebble finish by Stonescapes.
• Porcelain tile is outdoor and anti-slip rated.
• Stairs and benches are customizable.

Family | 12' x 25'
$75,000
Construction Timeline: 5-6 Weeks
See What's Included
• Planning & Engineering
• Excavation, Steel, & Plumbing
• 4500 psi Shotcrete (Concrete)
• Porcelain Tile Coping & Waterline
• Mini Pebble Interior Finish
• Energy Efficient Equipment
• Automation, Autofill, and (2) LED Color Lights
Optional Upgrades
• Gas Pool Heater - $6,000
• Electric Pool Chiller & Heater - $9,500
• 6 Therapeutic Jets - $4,500
• Child Safety Fence - $7,000
• Saltwater Upgrade - FREE
• Umbrella Sleeve - $50
• Spa Integration - $25,000 (* Price includes Gas Heater and Jets)
Additional Information
• HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.
•Soils report - $4,500 (If city requires it).
• 6 week construction window starts once permits are received.
• Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.
• Pool equipment and automation by Hayward.
• Saltwater system comes standard but may be excluded if desired.
• Mini pebble finish by Stonescapes.
• Porcelain tile is outdoor and anti-slip rated.
• Stairs and benches are customizable.

Entertainer | 15' x 30'
$90,000
Construction Timeline: 5-6 Weeks
See What's Included
• Planning & Engineering
• Excavation, Steel, & Plumbing
• 4500 psi Shotcrete (Concrete)
• Porcelain Tile Coping & Waterline
• Mini Pebble Interior Finish
• Energy Efficient Equipment
• Automation, Autofill, and (3) LED Color Lights
Optional Upgrades
• Gas Pool Heater - $6,000
• Electric Pool Chiller & Heater - $9,500
• 6 Therapeutic Jets - $4,500
• Child Safety Fence - $7,000
• Saltwater Upgrade - FREE
• Umbrella Sleeve - $50
• Spa Integration - $25,000 (* Price includes Gas Heater and Jets)
Additional Information
• HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.
•Soils report - $4,500 (If city requires it).
• 6 week construction window starts once permits are received.
• Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.
• Pool equipment and automation by Hayward.
• Saltwater system comes standard but may be excluded if desired.
• Mini pebble finish by Stonescapes.
• Porcelain tile is outdoor and anti-slip rated.
• Stairs and benches are customizable.

Know Exactly What You're Paying For!
Many budget builders advertise low prices, but those numbers often come from cutting corners. At Modul, we do the opposite; premium materials, higher standards, and quality that’s built to last.
| Features | Modul Luxury Pools | Budget Builders |
|---|---|---|
| Structural Quality |
#4 Rebar, 4500 psi Shotcrete, and 2.5" Plumbing.
|
#3 Rebar, 3000 psi Shotcrete, and 1.5" Plumbing.
|
| Coping |
Luxury Porcelain Tile
|
Basic Concrete
|
| Waterline Tile |
Luxury Porcelain Tile
|
Outdated Ceramic Tile
|
| Interior Finish |
High Quality Mini Pebble
|
Cheap White Plaster
|
| Lights |
(2) LED Color Lights
|
(1) Standard White Light
|
| Pump |
High Efficiency Variable Speed
|
Single Speed
|
| Automation |
Omni 4-Way Automation with Phone Controls
|
Not Automation
|
| Autofill |
Included
|
Not Included
|
| Construction Timeline |
5-6 Weeks
|
8-16 Weeks
|
| Total Job Costs |
Upfront, 100% Transparent Pricing
|
Hidde Fees and Up Charges
|
Premium Luxury Tile & Coping Options
No cheap concrete coping or outdated and ugly ceramic waterline tile. We only use the highest quality porcelain tile to give your pool that beautiful modern and luxurious look you deserve.

Ardesia | Light

Ardesia | Grey

Ardesia | Black
Pebble Finish Options
Personalize your pool with a choice of three stunning mini pebble finishes. From vibrant tropical blues to serene earth tones, each color creates a unique water hue and texture for a look that’s unmistakably yours.

Mini Pebble | White

Mini Pebble | Aqua Blue

Mini Pebble | Midnight Blue
Build & Price Your Pool
Financing?
Yes, we have financing options for Modul customers. Request a Free consultation today to get started.
Our Project Pipeline is Filling Up Fast! Reserve Your Spot Today & Enjoy Your Pool This Spring & Summer.
Request Your Free Consultation
Los Angeles
Orange County
San Diego
Inland Empire
Coachella Valley
Ventura
Sacramento
Book Your Appointment
We will get back to you as soon as possible.
Please try again later.
By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.
How We Build Modul Pools?
Week 1
Excavation, Steel, and Plumbing.
The first phase begins with excavating the area where your pool will take shape. Once the ground is prepared, we install the steel reinforcement framework that gives the pool its strength and structure. At this stage, all plumbing lines are run, and essential equipment is set in place to support the pool’s future operation.


Weeks 2-3
Shotcrete
Next comes one of the most critical steps: forming the concrete shell. We use high-strength 4500 psi shotcrete, applied under pressure to create a durable, watertight structure for your pool. After the shell is completed, it requires a curing period and proper maintenance to ensure maximum strength and longevity.
Weeks 3-4
Luxury Waterfall Edge Tile & Coping
The Finishing Touch That Defines Your Pool
Once the concrete shell has fully cured, the artistry begins. Our masonry team carefully installs the coping and tile, the details that frame and define your pool’s design. This is the moment when the transformation really comes to life.
At Modul, every pool is finished with premium porcelain tile, expertly mitered at 45 degrees. This technique creates a seamless waterfall edge that flows from coping to waterline tile, giving your pool a timeless and luxurious look you won’t find in standard builds.
Why We Never Use Concrete Coping?
After building thousands of pools, we’ve seen one thing again and again: concrete coping is a problem waiting to happen.
- Discoloration: Sun, water, and chemicals quickly cause uneven fading.
- Cracking: Shifts in soil and natural expansion often lead to fractures.
- High Maintenance: Frequent sealing and patching become necessary just to keep it looking presentable.
These issues aren’t just common, they’re almost inevitable. That’s why we’ve eliminated them from our construction process.


Weeks 3-4
Pebble Interior Finish
The Final Layer: Beauty That Lasts
The last step in bringing your pool to life is applying the interior finish. At Modul, we use a high-quality mini pebble surface, a blend of natural stones that creates a smooth, durable, and visually striking finish. This final layer isn’t just about looks; it’s engineered to stand up to decades of use while keeping your water sparkling and inviting.
Why We Don’t Offer Plaster
While traditional plaster is the cheapest option available, we’ve chosen not to offer it and here’s why:
- Short lifespan: Plaster typically needs to be redone within 5–7 years due to etching, staining, or roughness.
- Maintenance headaches: It’s far more vulnerable to chemical imbalance, requiring strict upkeep just to avoid damage.
- Appearance issues: Over time, plaster discolors, spots, and becomes rough underfoot, diminishing both comfort and beauty.
We’ve seen too many homeowners spend more time and money resurfacing a plaster pool than they ever expected.
Weeks 5-6
Project Completion
With the interior finish complete, your pool is ready to be filled with water. Our team carefully balances and starts up the system, ensuring everything runs smoothly.
We also walk you through the operation of your pool equipment so you feel confident maintaining it.
At this point, your pool is officially ready for you and your family to enjoy.
Financing?
Yes, we have financing options for Modul customers. Book your consultation and our team will assist you with the financing process.
Smarter Pools. Happier Customers.
Testimonials
Rated 5/5 by Homeowners
Amanda T.
Southern California
From Design to Dive in Just Weeks.
"I couldn’t believe how fast and easy the process was. Clear pricing, beautiful options, and no surprises. We were swimming in under six weeks!"
Luxury Look Without the Luxury Price.
"Our pool looks like something out of a magazine and it didn’t break the bank. The curated tile and pebble choices made it simple but still felt totally custom."
David R.
New York
Zero Stress. All Reward.
"This was hands down the smoothest construction project we’ve ever done. They told us exactly what to expect, stuck to it, and delivered an incredible pool ahead of schedule."
Michelle K.
Southern California
Where is Modul Available?
California
Los Angeles
Orange County
Inland Empire
San Diego
Coachella Valley
Ventura
Santa Barbara
Sacramento
New York
Let's Build Your Modul
Request Your Free Consultation
Los Angeles
Orange County
San Diego
Inland Empire
Coachella Valley
Ventura
Book Your Appointment
We will get back to you as soon as possible.
Please try again later.
By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.
Our Story
OC Poolscapes has spent years designing and building some of the most high-end custom pools in Southern California. But as costs rose and timelines stretched longer, we saw a gap in the market and an unmet need for homeowners who wanted the look and quality of a luxury pool, but without the overwhelming process or six-figure price tag.
To solve that problem, we created Modul Pool Systems.
Born from our experience in custom design, Modul takes the best parts of high-end pool building, elegant finishes, beautiful shapes, & solid craftsmanship and packages them into a faster, smarter, and more affordable solution.
With pre-designed pool shapes, curated finish options, and transparent pricing, Modul gives homeowners a simple and stress-free path to owning a modern, in-ground pool. No drawn-out timelines, no endless decisions, and absolutely no hidden fees.
Whether you're looking for a personal plunge pool, a stylish Airbnb upgrade, or a small backyard oasis, Modul delivers luxury made for real life, built in 6 weeks or less by OC Poolscapes.
Frequently Asked Questions
Are there any restrictions?
Pool area must be relatively flat with minimal demolition required.
Cannot be on a slope or hillside.
Minimum of 4' access required for excavation.
Pool equipment location relative to the pool cannot exceed 100 feet.
Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.
Are there any upgrades or add-ons?
We have multiple optional upgrades available for customers.
Pool Heater - $6,000
Pool Chiller & Heater - $9,500
6 Therapeutic Jets - $4,500
Child Safety Fence - $7,000
Saltwater Upgrade - $0
Umbrella Sleeve - $50
Can I add a spa to my pool?
Yes. We have an optional spa integration add-on option for $25,000. Includes gas heater and jets.
The spa is fully integrated within the pool’s existing perimeter. It is not built as a partial extension or outside addition. Instead, the spa is designed to fit entirely inside the pool’s footprint, which means selecting the spa upgrade does not increase the pool’s total perimeter or overall area.
What kind of pool is Modul?
Modul is a custom in-ground concrete pool built with 4500 psi shotcrete.
Are there financing options?
Yes. We have partnered with Lyon Financial to finance our customers.
What areas is Modul available in?
Modul is currently available in most cities within Southern California and New York.
Are permits included in pricing?
While we handle the permitting and planning process, permit fees are not included in the price of the pool. Fees are paid directly to the City by the homeowner.